A new, powerful Citizen Portal experience is ready. Switch now

Riverbanks Zoo previews Bridge to the Wild expansion, targets construction start in 2027

September 08, 2026 | Lexington County, South Carolina


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Riverbanks Zoo previews Bridge to the Wild expansion, targets construction start in 2027
Riverbanks Zoo presented a design and schedule update for its Bridge to the Wild expansion at Lexington County's session.

"I'm Lachlan Wooten," the presenter said, and he walked council through a short video and project scope, describing an elevated boardwalk from the Saluda River bridge into new garden and hillside exhibits. The program envisions a restaurant and event space at the entry, an elevated boardwalk with primate viewing, an indoor red panda facility for climate-sensitive animals, and multiple tiger habitats — including a smaller den for a mother and cubs and a larger open-top habitat with water features.

Wooten said the project footprint is roughly 4.5 acres and emphasized environmental protections: invasive-species removal, slope stabilization and coordination with South Carolina Department of Natural Resources on confiscated or rescued wildlife care. "We expect construction to begin in '27," he said, and added that staff expect vertical construction activity in 2028 with potential guest-facing phases by late 2028 or early 2029 depending on animal transfers and regulatory processes.

Council members asked about visitor capacity, the fate of the older zip-line attraction, construction challenges on the steep hillside and the vendor team. Wooten said the contractor has local experience with the site and that the project team is pursuing low-impact construction techniques to protect wetlands and minimize blasting.

No formal action was required; the briefing was informational and staff said they would continue design, permitting and coordination with county and West Columbia partners.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

✓
Watch full, unedited meeting videos
✓
Search every word spoken in unlimited transcripts
✓
AI summaries & real-time alerts (all government levels)
✓
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee