A new, powerful Citizen Portal experience is ready. Switch now

Chula reviews water operations: backup operator, tower options and rate figures

September 08, 2026 | Chula, Livingston County, Missouri


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Chula reviews water operations: backup operator, tower options and rate figures
The Chula Board of Aldermen spent a portion of the Sept. 8 meeting on water-system operations, personnel and budget details. Fred Oertwig will contact Roger Pergande to meet with the new operator, Adam, on Sept. 10 so Roger can show him the pump, lagoon and other facilities; the board noted Roger will return as a backup operator and be paid as needed. The council said it still needs ordinances in place before it can pay Ann Hamilton.

Board members also discussed infrastructure options: checking pipe size with Missouri Rural Water (Darla) and pursuing a direct feed that could eliminate the need for the tower and reduce recurring painting costs. The board reported DNR compliance was met except for several missing EDMR reports the city must submit. On rates and budget the transcript lists prior and current cost and retail figures: the old water cost was $11.50 sold at $16 per 1,000 gallons (difference $4.50); the current cost was listed as $14.70 sold at $19 per 1,000 gallons (difference $4.30). Last year’s water budget was $19,800; this year’s is $18,920 with $12,000 budgeted to pay the wastewater operator.

Don't Miss a Word: See the Full Meeting!

Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.

✓
Get instant access to full meeting videos
✓
Search and clip any phrase from complete transcripts
✓
Receive AI-powered summaries & custom alerts
✓
Enjoy lifetime, unrestricted access to government data
Access Full Meeting

30-day money-back guarantee