Roadmaster Tom Showalter told the board that paving performed by Yellow Mountain and Forest Paving is complete but that edges will need to be compacted after the paving has had time to harden. He said basin work at the sewer plant was completed and described development plan reviews for Lowell Martin and a sewer extension for Blainsport Road and Windy Mansion Road where manholes can be centered in the road.
Showalter identified two failing pipes that require replacement: one on Swamp Church Road that will be replaced with an 18‑inch concrete elliptical pipe and another on Mechanic Street that needs replacement within the next few weeks. He also said the Township expects the contract for flashers on Indiantown Road to be advertised next week, with a bid opening set for Sept. 17. The board recorded discussions about guiderail replacement on Creamery Road and a potential pole replacement on Galen Hall Road, along with routine equipment servicing and shoulder mowing.