A new, powerful Citizen Portal experience is ready. Switch now

Board approves pilot for lower-cost dirt-road stabilization after staff outlines $4.5M alternative to full paving

September 02, 2026 | Hillsborough County, Florida


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Board approves pilot for lower-cost dirt-road stabilization after staff outlines $4.5M alternative to full paving
Hillsborough County staff returned with options for lower-cost alternatives to asphalt paving for county dirt roads and recommended a standard treatment combining geogrid, geotextile fabric and a permeable aggregate surface. Josh Belotti said the estimates for the recommended treatment range from $400,000 to $750,000 per mile, "averaging around $600,000 per mile," and that applying the treatment to the 27 roads the board adopted for dirt-road maintenance would cost about $4,500,000 versus $63,000,000 estimated for full asphalt paving.

Staff identified Valley Tree Drive as a representative pilot with a planning and construction estimate of roughly $100,000 and an expected 9-month procurement and construction timeline; the board voted 7-0 to proceed with the pilot and evaluate results for broader application and future budget cycles.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

✓
Watch full, unedited meeting videos
✓
Search every word spoken in unlimited transcripts
✓
AI summaries & real-time alerts (all government levels)
✓
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee