Public Works Director (speaker 14) told the Budget Committee the department uses the pavement quality index and MnDOT data to track system health and is aiming to have 12% or less of the county road network in poor condition; at current rates that equates to roughly 35 miles. "A goal of 12% of the network means that at a point in time, there would be roughly 35 miles of pavement in poor condition," the director said.
The presentation also covered crash‑rate trends and design strategies to reduce crashes — for example, converting four‑lane roads to three lanes and targeted corridor investments (Rice Street was cited as a high‑crash segment). On environmental front, Public Works described tracking chloride (salt) concentrations in lakes, noting the county is purchasing roughly 9,000 tons of salt this year at approximately $600,000 and that partners and stormwater management will be necessary to reduce impacts. Commissioners sought clarity on which roads are measured, how MnDOT's biennial van survey is used, how transfers of ownership affect measures, and whether chloride efforts are targeted to specific lakes; directors agreed to provide follow‑up data.