A new, powerful Citizen Portal experience is ready. Switch now

Commission approves ALDOT agreement for Riverside Bridge replacement

August 10, 2026 | Saint Clair County, Alabama


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Commission approves ALDOT agreement for Riverside Bridge replacement
The commission approved an agreement with the Alabama Department of Transportation to proceed with the Riverside Bridge replacement project. County engineer Clay Phillips told commissioners the agreement had been received from ALDOT and that staff expect work to begin in late FY27 or in FY28; he said funds are available through FY29. The motion to approve the agreement was moved, seconded and carried.

Commissioners discussed whether the project might require demolition of the old span and noted possible historical considerations because the structure may date to the 1930s or be a CCC-era bridge. Phillips said engineers have drafted two alternatives — either installing a spillway or replacing pipes — and that updated cost estimates will be required before construction starts.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee