A new, powerful Citizen Portal experience is ready. Switch now

Developer seeks easement and setback waiver for proposed Springfield Russell solar project

August 10, 2026 | North Springfield, Windsor County, Vermont


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Developer seeks easement and setback waiver for proposed Springfield Russell solar project
Geoff Martin of Norwich Technologies presented a preliminary concept for the "Springfield Russell" solar project (up to 5 megawatts) on private land behind existing arrays off Fairground Road. Martin asked the Town to consider (1) granting an access easement across the fairground parcel to avoid construction traffic on residential Edgewood Drive, (2) preparing a draft waiver of the 50‑ft property line setback under Section 248/PUC rules to allow panels closer to the Town parcel, and (3) leasing 2–2.5 acres of town land west of the existing array for additional panels.

The presenter said the project would interconnect via existing poles, generate new utility‑tax revenue and could provide lease or easement payments to the Town, but it would need a full Section 248 permitting process with notice and petition to the Public Utility Commission. The Board authorized the Town Manager to work with Norwich Technologies to draft a 50‑ft setback waiver and access easement option for future consideration.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee