A new, powerful Citizen Portal experience is ready. Switch now

Board allows asphalt millings instead of full paving for contractor yard at Black Hills Industrial Center

August 07, 2026 | Rapid City, Pennington County, South Dakota


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Board allows asphalt millings instead of full paving for contractor yard at Black Hills Industrial Center
The Rapid City Zoning Board approved a variance allowing the use of asphalt millings — rather than a fully hard-surfaced pavement — for a roughly 19,000-square-foot contractor storage yard behind a contractor shop at 5823 Capacitor Street in the Black Hills Industrial Center.

Staff member Jessica (S10) said the site is in a Heavy Industrial zoning district, has limited nearby residences and low traffic volumes, and that asphalt millings are a typical alternative surface for heavy-equipment operations. "They are requesting a variance to the hard surface paving requirements for the contractor storage yard, to allow asphalt millings in lieu of that hard surface," she said. Staff recommended approval with a stipulation requiring application of a dust palliative as needed or annually to address dust and tracking.

Commissioners asked about recourse if millings create future problems and about access; staff and commissioners said the heavy-industrial zoning and the yard’s rear location limit neighborhood impacts, and the stipulation on dust palliative would be the primary enforcement mechanism. Commissioner Karen moved to approve the variance with the dust-control stipulation; the board approved by voice vote.

Don't Miss a Word: See the Full Meeting!

Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.

Get instant access to full meeting videos
Search and clip any phrase from complete transcripts
Receive AI-powered summaries & custom alerts
Enjoy lifetime, unrestricted access to government data
Access Full Meeting

30-day money-back guarantee