A new, powerful Citizen Portal experience is ready. Switch now

Board updates on roads, engineering RFPs and crosswalk at Dodge's store

August 03, 2026 | New Boston, Hillsborough County, New Hampshire


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Board updates on roads, engineering RFPs and crosswalk at Dodge's store
During the Select Board report, members described outreach to engineering firms to solicit bids and prepare a clear RFP for town engineering services related to road projects. Jeff reported he had "started calling today different...engineering firms" to obtain quotes and emphasized the need for an RFP that outlines the scope so important details are not missed.

The board also discussed the South Branch footbridge dimensions and a crosswalk at Dodge's store; they noted that Consolidated (telecom) must move lines before the flashing light and sidewalk work can proceed. The chair authorized the highway agent to install a stop sign at Laurel Lane and swap a yield sign for a stop at Christie and Ruby; the board asked staff to push the RFP forward because winter conditions will complicate construction schedules.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee