A new, powerful Citizen Portal experience is ready. Switch now

Dam functioning; commissioners expect lower-cost 10-year engineering study in 2027

May 16, 2026 | Post Lake, Langlade County, Wisconsin


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Dam functioning; commissioners expect lower-cost 10-year engineering study in 2027
John Steber said the dam is functioning properly and that Ralph Eberle, the dam tender, will perform minor maintenance in the coming week. The board discussed the upcoming 10-year engineering study and Steber said he spoke with DNR contact Forrest Van Asten who indicated the study should not be as large or costly as previously expected.

Steber said the DNR will solicit competitive bids in spring 2027 and that total study costs are anticipated to be approximately $3,000–$4,000. No formal motion was made on the study at the May meeting; the board will await DNR guidance on the bidding process.

Don't Miss a Word: See the Full Meeting!

Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.

Get instant access to full meeting videos
Search and clip any phrase from complete transcripts
Receive AI-powered summaries & custom alerts
Enjoy lifetime, unrestricted access to government data
Access Full Meeting

30-day money-back guarantee