A new, powerful Citizen Portal experience is ready. Switch now

Staff urges replacement or retrofit of failing electric metering system after thousands of monthly read errors

July 31, 2026 | Smithville, Bastrop County, Texas


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Staff urges replacement or retrofit of failing electric metering system after thousands of monthly read errors
City staff described persistent metering and billing problems that generate hundreds or thousands of errors and require extensive manual reads. "They had 449 errors in July. They had 2,021 errors, warnings in, in July," Jennifer reported when explaining why the city needs a replacement or retrofit of its metering system to restore automated reads and reduce manual work and billing inaccuracies.

Staff said the failed or failing electric AMI hardware and software produces delayed and inaccurate data that creates time-consuming manual corrections, lost revenue, and customer confusion when corrected reads produce higher bills. Council and staff discussed options: retrofitting meter electronics compatible with existing meter bases to save cost, deploying customer portals (Mueller quote referenced at $21,000 for a water portal), and obtaining competitive bids by late August so the city can have numbers before any proposed bond or CO sale. Staff warned that transition to correct readings may produce customer complaints as previously underbilled accounts see increases.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee