A new, powerful Citizen Portal experience is ready. Switch now

Commission requires stronger driveway substructure and runoff clarifications at 14 Bobby’s Road

July 09, 2026 | East Hampton, Lower Connecticut River Valley Planning Region, Connecticut


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Commission requires stronger driveway substructure and runoff clarifications at 14 Bobby’s Road
Applicant Brian Babcock presented a proposed single-family house for 14 Bobby’s Road via Zoom. The application described a pervious gravel driveway with a 6-inch stone base and downspouts routed to chamber units and an infiltration system; members asked for more specific driveway construction details and confirmation that roof runoff would be fully collected and routed to appropriate infiltration features.

Robert Hart moved that the commission require three clarifications: "1) Clarify driveway subsurface preparation to accept infiltrated water from the driveway; 2) Clarify entire roof runoff collection to be sure it feeds roof leader; 3) Clarify Footing Drain Outlet to avoid draining water onto the road." The motion was seconded by John Purple and passed 6-0. Commissioners specifically requested an 8-inch substructure recommendation for the driveway to ensure adequate crushed-stone depth and effective infiltration; they also questioned the location and filtration path of a stone splash pad adjacent to the chamber units.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee