Brian Schuster of ESA told the Planning Commission that Impact GHG‑1 (the net‑zero, offset‑based mitigation) was removed from the final EIR and therefore the CEQA document no longer contains a requirement for the project to meet a specific net‑zero GHG threshold or to track emissions as a CEQA mitigation measure. "The removal of Impact GHG‑1 also removed any mandate to achieve a specific greenhouse gas target for the project and any tracking that goes along with that," Schuster said.
He emphasized that other project requirements remain: onsite renewable energy, a solar field and up to 500 megawatts of battery storage in the specific plan, LEED/GreenPoint design standards, low‑GWP refrigerants, renewable fuel shuttles and a TDM program to reduce VMT. Schuster and other commenters also said that tracking emissions voluntarily or via provisions in a development agreement or city policy remains possible even if CEQA no longer requires it. Commissioners asked staff whether the city could require annual GHG tracking; staff said the specific plan does not include a tracking requirement but that the commission could recommend additional monitoring or contractual obligations in the development agreement or policy context.