A new, powerful Citizen Portal experience is ready. Switch now

City schedules pump motor replacement and installs generator for lift station after equipment failures

January 01, 2026 | Jefferson, Union County, South Dakota


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

City schedules pump motor replacement and installs generator for lift station after equipment failures
City staff reported a series of water and wastewater repairs. The city ordered a replacement motor for the high-service pump at the water plant after the spare pump on hand was found not to work. Staff installed a new chlorinator head and ejector and reported chlorine levels within acceptable range. Two in-home shutoffs were performed for interior leaks and one old meter was replaced.

At the wastewater lift station staff replaced a lost-phase sensor on Jan. 10, 2023 and ordered a replacement float after finding the lead float inoperable; a new generator for Lift Station 1 was delivered and city staff expect installation in one to two weeks. Separately, a contractor reported the sewer line at 607 Wilson Street was completely collapsed and will extend the clean-out in spring to provide future maintenance access.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee