A new, powerful Citizen Portal experience is ready. Switch now

Mill Street bridge closure expected ~2 weeks; Summit Road work may last through March 2027

July 20, 2026 | Pataskala City, Licking County, Ohio


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Mill Street bridge closure expected ~2 weeks; Summit Road work may last through March 2027
Public works (Alan) reported that the Mill Street bridge closed and crews will reset a wing wall, anchor it, and aim to reopen the road in about two weeks. "We closed that today. It should take about 2 weeks to reset that wing wall, anchor it, and get the road back open there," he said.

Alan also described a longer closure on Summit Road north between Cable Road and Morse for the Licking River Basin Water District’s sanitary and water-line work. He said the closure is a full point closure that will move as work proceeds and that the district expects the closure to last through roughly March 2027, with paving and utility work continuing as they progress.

Council members asked whether both lanes would be closed and were told the equipment and location require a full closure at the work point; crews will repave lanes in places as work is completed.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee