Turner Construction presented a Bid Submission Report for the Adel EMS Station that lists pre-approved bidders under Iowa Code Chapter 26A for multiple trade packages (concrete, gypsum, metal building, plumbing/mechanical, electrical, sitework and more). The packet names specific firms approved to bid for each package and identifies non-Chapter 26A bidders and material suppliers for certain packages.
The materials also include a 20% construction-document (CD) deliverable compared against the final GMP deliverable dated July 21, 2026. The comparison table shows a small net change: the Total Preconstruction & Construction figure declined 1.33% from the 20% CD to the FGMP deliverable, with itemized shifts in general requirements, direct work, insurances and contingencies. The report lists alternates and line-item deltas for specific alternates and specialty items.
The packet is a pre-bid administrative deliverable: it establishes an approved bidder list for Chapter 26A bid packages, documents bidder categories, and records the internal cost comparison to inform upcoming solicitation and GMP activities. The materials do not record a formal board vote on awards at this meeting; they appear as informational materials supporting CMAR procurement activities and planned bid solicitations in the fall.