A new, powerful Citizen Portal experience is ready. Switch now

ARDOT will replace Highway 5 overpass with SPUI; project due mid-2028, officials say

June 27, 2026 | Rose Bud, White County, Arkansas


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

ARDOT will replace Highway 5 overpass with SPUI; project due mid-2028, officials say
The Arkansas Department of Transportation is rebuilding the Highway 5 interchange at Interstate 57 in Cabot and plans to replace the existing overpass with a single-point urban interchange (SPUI), the broadcast reported.

ARDOT officials said the SPUI funnels traffic from multiple directions through a single signal, reducing conflict points and improving efficiency and safety at the interchange that connects Lonoke and Pulaski counties. The agency told the report the project is on schedule with completion expected by mid-2028.

Gina Jones, president and CEO of the Cabot Area Chamber of Commerce, said the project comes at a critical time as Cabot continues to grow rapidly and residents who use the corridor daily said added lanes could make a major difference when the project is complete.

The package included animated before-and-after visuals and local reaction; the broadcast did not provide a full cost breakdown in the segment.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee