A new, powerful Citizen Portal experience is ready. Switch now

Council approves $13,400.38 change order to repair corroded north silo at Richmond water treatment plant

July 08, 2026 | Richmond , Ray County, Missouri


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Council approves $13,400.38 change order to repair corroded north silo at Richmond water treatment plant
The Richmond City Council approved Olsson’s Change Order No. 2 for repairs at the city’s Water Treatment Plant during the Nov. 12 meeting, authorizing City Administrator Tonya Willim to sign the order. The change order addresses a corrosion and fit issue discovered by the welding team on Oct. 29, 2024.

Welders found the existing base angle of the plant’s north silo was out of round, preventing proper welding of the new steel plate (Change Order No. 1). Olsson engineers proposed cutting away the existing skirt, installing an additional steel plate to reinforce the structure, and fully welding the circumference to prevent further water intrusion, the stated cause of the corrosion. The council approved the change order in the amount of $13,400.38 by an 8-0 roll call vote.

Council recorded the technical rationale for the repair in the meeting record; the transcript does not include the contract’s original value or the overall funding source for the repair work. The City Administrator was authorized to sign the change order and proceed with the repair work.

Next steps: The City Administrator will execute the change order and coordinate repair scheduling with Olsson and the contractor.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee