A new, powerful Citizen Portal experience is ready. Switch now

Roberts Cove Road to close July 6 for bridge replacement; town may salvage old granite deck

June 10, 2026 | Alton Town, Belknap County, New Hampshire


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Roberts Cove Road to close July 6 for bridge replacement; town may salvage old granite deck
The board notified the public on June 9 that a tentative construction schedule calls for Roberts Cove Road to be closed beginning July 6 at 6:00 a.m. between Brook/Bridal and Piper Point Road for a bridge replacement project.

Highway staff said contractor Mike Bean will begin by removing guardrails and the existing pavement and concrete deck, then excavate footings and install the new deck. The closure is scheduled through July 27 or until the project is completed; the town cautioned that timing is tentative and updates will be posted if the schedule changes.

Officials said the contractor will secure the site nightly with concrete barriers and chain-link fencing and urged the public to stay out of the work zone because of safety hazards. The board also said it will evaluate the condition of the old granite deck slabs; if they are salvageable the town may remove and repurpose them, but stone abutments will remain undisturbed.

The board said it will post the contractor’s one-page schedule on the town website and the town Facebook page so residents can track progress.

Don't Miss a Word: See the Full Meeting!

Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.

Get instant access to full meeting videos
Search and clip any phrase from complete transcripts
Receive AI-powered summaries & custom alerts
Enjoy lifetime, unrestricted access to government data
Access Full Meeting

30-day money-back guarantee