Representatives from Sebago Technics, Ally Hubert and Nick Surley, presented Nordy Dental’s revised site plan on June 1. Planning staff (Michael) reported that previous buffer determinations were already made, required granite bounds and iron markers were placed, drainage modeling had been submitted and responses addressed reviewer comments, and letters were received from the local water and sanitary districts.
Michael said the final plan met the town’s criteria and that standard conditions — including erosion‑control measures during construction, screening for a proposed six‑foot dumpster enclosure, adherence to setbacks and fire safety measures with a nearby hydrant — were now on the plan. The board voted unanimously to accept the plan and noted that remaining items (erosion control, setbacks and screening) are to be enforced during construction.
Next steps: the applicant may proceed under the approved plan subject to the conditions; staff will monitor compliance during construction.