A new, powerful Citizen Portal experience is ready. Switch now

Commission approves multiple UDC updates, adds requirement for a nut-bearing tree on buildable lots

May 07, 2026 | Walton County, Georgia


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Commission approves multiple UDC updates, adds requirement for a nut-bearing tree on buildable lots
At its May 7 meeting the Walton County Planning Commission approved a suite of proposed updates to the county Unified Development Code (UDC) and added a stipulation that each buildable residential lot include one nut-bearing tree.

Staff (referred to as Christie) presented a set of amendments including corrections to verbiage in the utilities article, changes to the overlay district language, updates to thresholds for developments of regional impact (adding thresholds such as 10,000 trips/day or a truck-stop threshold), deletion of specimen-tree references in the tree appendix and an expanded species guidance list covering soil and drought tolerance. The package also revised fees: a residential minimum permit fee of $75, a flat $75 fee for accessory buildings under 500 ft², a construction-trailer permit at $0.25/ft², and a $100 per-utility-permit fee.

Commissioners voted to approve the amendments with one item (amendment four, the DRRI threshold changes) held for separate handling; during the meeting the commission moved to add a requirement that every buildable residential lot include at least one nut-bearing tree as part of the UDC changes and voted to include that requirement. The commission set performance/maintenance bond language to 18 months (replacing a prior 12-month reference) and clarified public-notice fees to be included in the schedule.

Planning staff said the tree-species chart will provide guidance for plantings in parking lots, screening and natural areas and will note whether species are native to Georgia. Commissioners emphasized preserving existing timber where possible and adding landscape standards at new entries.

The UDC amendments (with the nut-bearing-tree requirement and fee changes) were approved by the planning commission and will be forwarded to the Board of Commissioners for final adoption; the transcript records the commission’s vote to send most changes forward and to discuss one amendment separately.

Don't Miss a Word: See the Full Meeting!

Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.

Get instant access to full meeting videos
Search and clip any phrase from complete transcripts
Receive AI-powered summaries & custom alerts
Enjoy lifetime, unrestricted access to government data
Access Full Meeting

30-day money-back guarantee