A new, powerful Citizen Portal experience is ready. Switch now

Architects present schematic designs for new Cliff school: 56,690 sq. ft. building for 195 students

May 07, 2026 | SILVER CONSOLIDATED SCHOOLS, School Districts, New Mexico


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Architects present schematic designs for new Cliff school: 56,690 sq. ft. building for 195 students
Decker architects provided the board and public with a schematic design recap for the new Cliff school project. Presenters said the building is currently envisioned at about 56,690 square feet and designed to serve approximately 195 students, with a program organized into elementary and secondary wings around a central hub that contains gym and cafeteria spaces.

Architects outlined the four phases of the design process — programming, schematic design, design development and construction documents — and said the project had completed schematic design and was entering design development. Design priorities cited included resilient, low‑maintenance materials; maximizing natural light and community‑facing spaces; flexible classroom configurations for future adaptability; and preserving opportunities to display school legacy and history within the building.

Site planning shown in the presentation preserves the existing school during construction, places bus drops and athletic fields north of the building and locates the new construction to the east to allow staged demolition. The team also showed preliminary massing and material studies and said a project website (linked via a QR code presented at the meeting) is live for community viewing of the preliminary concepts.

No action was taken; design work will continue with the Cliff design committee and additional public updates will be posted to the project website as the team advances to construction documents.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee