A new, powerful Citizen Portal experience is ready. Switch now

Selectmen approve bottle-filler installation and donor-brick patio at Waveny playground

May 05, 2026 | New Canaan, Fairfield, Connecticut


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Selectmen approve bottle-filler installation and donor-brick patio at Waveny playground
The Board of Selectmen on May 5 approved two parks projects at Waveny Park: a contract with Hussy Bros Excavating to install a pre-purchased bottle-filler unit (installation cost $5,900 with a $600 contingency, total $6,500) and a contract with Peter Lanny, Inc. to install a stone patio and donor brick walkway ($34,140 plus $3,400 contingency, total $37,540).

Parks staff said the bottle-filler installation includes a new water line tied to the existing meter, an ADA-compliant concrete pad and a 4-inch drain with stone; funding is available within the parks capital playground replacement budget. On the donor-walkway project staff said all donor bricks have already been purchased and delivered through the Friends of the Waveny playground fundraising campaign and that the stone patio and walkway work is anticipated to be completed in May 2026.

Selectmen asked staff to include documentation of bid solicitations and vendor outreach in the project record because only one bidder submitted on the patio/brick work after multiple solicitations; staff provided the list of five companies solicited and explained timing and contractor availability were factors.

Provenance: Topic intro SEG 1142; topic finish SEG 1244.

Don't Miss a Word: See the Full Meeting!

Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.

Get instant access to full meeting videos
Search and clip any phrase from complete transcripts
Receive AI-powered summaries & custom alerts
Enjoy lifetime, unrestricted access to government data
Access Full Meeting

30-day money-back guarantee