A new, powerful Citizen Portal experience is ready. Switch now

Traffic commission splits on signal removals: Shauno/Skird vote fails; Dman/Taylor signal to be removed

April 23, 2026 | Green Bay, Brown County, Wisconsin


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Traffic commission splits on signal removals: Shauno/Skird vote fails; Dman/Taylor signal to be removed
Commissioners considered staff and consultant findings on traffic signals deemed "unwarranted" at two locations.

For Shauno Avenue and Skird Street, staff presented a consultant report that said signals were not warranted; staff proposed replacing the signal with a pedestrian crossing. After a motion and discussion, the measure failed (the transcript records one "I oppose" and notes the motion did not carry).

Separately, staff recommended removing the signal at Dman and Taylor, citing reduced need following the 2016 41 project and noting the signal already operates on flashing red for 12 hours at night. Commissioners moved to convert that intersection to a three-way stop and remove the signal equipment; the motion passed.

Staff said the Shauno/Skird removal would be held until planned fall work when a hospital driveway change will take effect and that any future signal reconstruction would require showing the state that the connecting highway's operations would not be adversely affected.

Don't Miss a Word: See the Full Meeting!

Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.

Get instant access to full meeting videos
Search and clip any phrase from complete transcripts
Receive AI-powered summaries & custom alerts
Enjoy lifetime, unrestricted access to government data
Access Full Meeting

30-day money-back guarantee