Here are the formal actions taken by the City of Alpharetta Design Review Board on April 17, 2026. Tallies and conditions below reflect motions recorded during the public hearing.
• Minutes: Approved city of Alpharetta Design Review Board minutes of March 20, 2026. Vote: 6‑0.
• 58 Canton Street (DRB2600004): Motion to approve awning and paint as presented (hunter green awnings with antique‑gold lettering; paint doors and frames). Conditions: applicant to coordinate façade repairs with landlord/HOA if necessary. Vote: 6‑0.
• Dolce Spoon monument sign (DRB2605): Approved with conditions — raise circular disc to the top of the posts; reduce the rectangular backing to 30 inches and center it on the circle; add top and bottom trim; provide ground cover around the base; final color chips to staff. Vote: 6‑0.
• Chevron to BP rebrand (DRB26006): Approved canopy/pump panel branding changes; canopy will use a flat decal and only the BP logo will receive halo backlighting. Condition: replace existing red banding on the monument sign with Brookside green to better match village standards. Monument copy digits to be manual (no digital price reader). Vote: 6‑0.
• AC Hotel Northwinds (DRB26007): Multiple motions — (1) approve site plan, landscaping and site lighting as submitted (vote: 5‑0); (2) defer final signage approval to staff (vote: 5‑0); (3) approve elevations/materials with conditions requiring a dark brick veneer on the retaining wall facing Hannes Bridge and either a velour/textured dark brick with the original mortar or, if that brick is unavailable, the lighter 'Magnolia Mason' mortar mix; applicant to submit sample panel for staff review (vote: 5‑0).
Staff will track outstanding items (final color/mortar chips, façade repair coordination, and sample panel submission) and the applicants must secure any landlord/HOA agreements before work or sign installation proceeds.