A new, powerful Citizen Portal experience is ready. Switch now

Votes at a glance: Alpharetta Design Review Board, April 17, 2026

April 17, 2026 | Alpharetta, Fulton County, Georgia


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Votes at a glance: Alpharetta Design Review Board, April 17, 2026
Here are the formal actions taken by the City of Alpharetta Design Review Board on April 17, 2026. Tallies and conditions below reflect motions recorded during the public hearing.

• Minutes: Approved city of Alpharetta Design Review Board minutes of March 20, 2026. Vote: 6‑0.

• 58 Canton Street (DRB2600004): Motion to approve awning and paint as presented (hunter green awnings with antique‑gold lettering; paint doors and frames). Conditions: applicant to coordinate façade repairs with landlord/HOA if necessary. Vote: 6‑0.

• Dolce Spoon monument sign (DRB2605): Approved with conditions — raise circular disc to the top of the posts; reduce the rectangular backing to 30 inches and center it on the circle; add top and bottom trim; provide ground cover around the base; final color chips to staff. Vote: 6‑0.

• Chevron to BP rebrand (DRB26006): Approved canopy/pump panel branding changes; canopy will use a flat decal and only the BP logo will receive halo backlighting. Condition: replace existing red banding on the monument sign with Brookside green to better match village standards. Monument copy digits to be manual (no digital price reader). Vote: 6‑0.

• AC Hotel Northwinds (DRB26007): Multiple motions — (1) approve site plan, landscaping and site lighting as submitted (vote: 5‑0); (2) defer final signage approval to staff (vote: 5‑0); (3) approve elevations/materials with conditions requiring a dark brick veneer on the retaining wall facing Hannes Bridge and either a velour/textured dark brick with the original mortar or, if that brick is unavailable, the lighter 'Magnolia Mason' mortar mix; applicant to submit sample panel for staff review (vote: 5‑0).

Staff will track outstanding items (final color/mortar chips, façade repair coordination, and sample panel submission) and the applicants must secure any landlord/HOA agreements before work or sign installation proceeds.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee