The Detroit Public Health and Safety Standing Committee on April 9 processed the department’s dangerous-buildings recommendations in a block-by-block review. The committee repeatedly adopted recommendations by voice vote, withdrawing properties where BC confirmed immediate issues had been addressed and directing additional review for others.
Key outcomes (sample of recorded dispositions): 3807 Fullerton — sent back to BC for further review after owner pledged repairs; 4574 Belvedere — withdrawn after the owner produced tarping and repair commitments; 13334 Gratiot — withdrawn as permit drawings were in process with Ashbourne Alliance; 13231 Conant — sent back to BC for re-inspection after owner reported recent return from overseas and submitted photos; 3758 Rolfe’s Place — committee agreed the owner may demolish and rebuild (owner-led demolition); several addresses listed by BC were ordered demolished, while others were sent back to BC for cost analysis or withdrawn when evidence of repair was provided.
How decisions were made: BC inspectors presented inspection dates and evidence for each property; the dangerous-building clerk and assistant chief explained outstanding issues (open windows, roof collapse, fire damage, yard debris). In many cases the committee moved to ‘send back to BC’ (allowing inspectors to confirm repairs or complete cost analysis) or to ‘withdraw’ properties after owners provided photos and showed progress.
Complete block-by-block dispositions were read into the record near the end of the hearing. The committee recorded multiple motions adopted by voice and a series of 'hearing no objections' entries; in some instances members specifically asked BC to pursue alternative outcomes (for example, return to BC to notify new owners where deed transfers had occurred). The committee also requested BC provide follow-up reports on properties sent back for cost analysis.
What owners should do: BC reiterated the department’s guidance — provide proof of ownership, pay required inspection fees, secure openings, remove debris and either obtain permits or submit a deferral application (and email photos of progress to the department inbox) — to avoid city-initiated demolition or liens.
Next steps: BC will perform the cost analyses and re-inspections the committee requested and report back to the committee on its findings and outreach efforts.