A new, powerful Citizen Portal experience is ready. Switch now

Design review board approves 1624 Narco Way addition with conditions to simplify roof and adjust fenestration

April 24, 2026 | Glendale, Los Angeles County, California


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Design review board approves 1624 Narco Way addition with conditions to simplify roof and adjust fenestration
The Glendale Design Review Board unanimously approved a one‑story house addition at 1624 Narco Way after staff presented five conditions intended to align the work with neighborhood scale and detail. Case planner Kiesel said the addition would increase the house from 2,172 to roughly 2,869 square feet and is exempt from CEQA as a Class 1 project because it does not exceed the applicable floor‑area thresholds.

Kiesel recommended conditions requiring front and street‑side landscape plans, a restudy of the Larko Way façade to improve scale and proportion (including lowering head heights and adjusting the bay window), a simplified roof plan to reduce awkward intersecting eaves, revised material choices that build on the existing house composition, and that proposed windows be fixed casement or hung, recessed within the façade.

Architect Vlad Artunyan, who said his office is handling the design, described a long permitting process accelerated by structural urgency: “Every time it rains, the ceiling collapses,” he told the board, requesting flexibility on materials given the homeowner’s repair needs. Board members generally supported the project’s modest scope but asked for a careful restudy of the semi‑circular front bay window and confirmation that the chimney and major features would be appropriately integrated with the new roof.

The board approved the project with the amended window operation condition and the remaining staff recommendations; the motion carried on a roll call vote.

Next steps: Applicant will submit revised window details and landscape plans to staff for review prior to building permits.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee