A new, powerful Citizen Portal experience is ready. Switch now

Tippecanoe drainage board accepts BND bid for Southwest Elliott pavement removal

March 05, 2026 | Tippecanoe County, Indiana


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Tippecanoe drainage board accepts BND bid for Southwest Elliott pavement removal
The board opened and read three bids for the Southwest Elliott pavement removal project earlier in the meeting: TDH Contractors LLC ($97,966), B and D All Terrain ($58,015.95) and Atlas Excavating ($175,157). The board took the bids under advisement pending staff review and said it would award at the end of the meeting.

Committee member (Speaker 1) later moved that the board accept the bid from BND in the amount of $58,015.95; the motion was seconded and passed by voice vote. The transcript does not provide a roll-call tally. Staff confirmed the bid amount and the board thanked all participants in the procurement process.

No contract number or formal award documentation was read into the record during the meeting; staff will process the award consistent with county procurement procedures and provide final contract documentation separately.

Don't Miss a Word: See the Full Meeting!

Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.

Get instant access to full meeting videos
Search and clip any phrase from complete transcripts
Receive AI-powered summaries & custom alerts
Enjoy lifetime, unrestricted access to government data
Access Full Meeting

30-day money-back guarantee