A new, powerful Citizen Portal experience is ready. Switch now

Commission hears transport project updates including $47M tunnel estimate for Thorpe Road study

February 27, 2026 | Spokane, Spokane County, Washington


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Commission hears transport project updates including $47M tunnel estimate for Thorpe Road study
In the meeting’s updates, staff reported that WSDOT is advancing the design phase for the Liberty Park land bridge and that consultants had completed a Thorpe Road study evaluating two tunnel options and bridge alternatives.

A staff speaker summarized the Thorpe Road study and said project work considered whether to enlarge the existing tunnel (which would require extended closures) or build a new tunnel to the north or south; staff cited a proposed tunnel price of about $47,000,000 for one of the options and said that enlarging the existing tunnel would be $8–9 million more expensive and would require one to two years of closure for mitigation. BNSF reviewed the plan and had no issues reported in the meeting.

Commissioners asked whether bridging over the tracks had been considered and requested additional cost and access information for public review. Staff said preliminary designs and an alternatives matrix will be available as the projects proceed to preliminary design.

Don't Miss a Word: See the Full Meeting!

Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.

Get instant access to full meeting videos
Search and clip any phrase from complete transcripts
Receive AI-powered summaries & custom alerts
Enjoy lifetime, unrestricted access to government data
Access Full Meeting

30-day money-back guarantee