A new, powerful Citizen Portal experience is ready. Switch now

City accepts low bid for Edgewater culvert repair; MJ Underground to proceed at $298,680

February 19, 2026 | Crown Point City, Lake County, Indiana


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

City accepts low bid for Edgewater culvert repair; MJ Underground to proceed at $298,680
The Crown Point Board of Public Works and Safety on Feb. 18 accepted a low bid and authorized contract execution for the Edgewater stormwater culvert replacement.

Eric, representing construction review, said American StructurePoint reviewed five bids and recommended MJ Underground as the low, responsive bidder at $298,680. The board moved to accept the low bid, issue a notice to proceed and authorize the mayor to sign the contract; the motion carried by voice vote.

Staff noted the repair will fully replace the culvert along Calvert (north of the Edgewater subdivision) and that the project previously had interim repairs. Funding for roughly 60% of the project was noted as coming from the local urban-based development commission, per staff remarks.

The board approved the award and directed staff to proceed with contractual authorization and project execution. A start date was not given in the meeting record.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee