A new, powerful Citizen Portal experience is ready. Switch now

Board briefed on four change orders for West Bradford Elementary expansion

February 05, 2026 | Downingtown Area SD, School Districts, Pennsylvania


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Board briefed on four change orders for West Bradford Elementary expansion
The board received a facilities report covering four change orders (GC12–GC15) that add scope to ER Stubner Inc., the general contractor on the West Bradford Elementary School expansion. The changes include additional materials to protect existing doors because of construction phasing, added VCT flooring, new custodian closets, VCT repairs flagged by the health department, and expedited elevator work to align with phasing changes.

Director Ross summarized the items and noted they are additions to the original scope required to meet phased construction needs and health-department recommendations. The report concluded without an immediate recorded vote in the transcript; the item was presented as a facilities committee report.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee