A new, powerful Citizen Portal experience is ready. Switch now

Council approves $300,000 design contract for Crosstown Road tunnel replacements

January 16, 2026 | Peachtree City, Fayette County, Georgia


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Council approves $300,000 design contract for Crosstown Road tunnel replacements
Peachtree City council approved a $300,000 design contract recommendation to replace two small corrugated-metal tunnels under Crosstown Road (known locally as the "Taco Bell Tunnel" and the "Regions Bank Tunnel").

Dave Borkowski, presenting the item, said a SPLOST-funded feasibility study found it feasible to replace the undersized tunnels with concrete box culverts meeting current city design standards. He said the two tunnels are in a floodplain, and the design work will include surveying, floodplain and drainage analysis and revisions to approaches to improve ADA access. The feasibility estimate for construction cited about $1.4 million per tunnel.

Staff recommended awarding the design to Pond & Company, noting that construction would not require raising Crosstown Road significantly; the design scope is $300,000 with a 12- to 18-month expected timeline. Council moved to approve agenda item 126006 for Crosstown tunnel design in the amount of $300,000; the motion passed on a voice vote.

The design phase will produce plans needed for bidding and will include floodplain mitigation measures such as drainage channels, ditches or pipes as required by the final design.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee