Commission takes discretionary review and approves Burnett Avenue hillside project with modifications amid geotechnical concerns

July 14, 2022 | San Francisco City, San Francisco County, California


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Commission takes discretionary review and approves Burnett Avenue hillside project with modifications amid geotechnical concerns
San Francisco ' The Planning Commission voted on July 14 to take discretionary review and approve a contested two-building, 18-unit hillside development at Burnett Avenue (333 Burnett and adjacent parcels), subject to staff modifications aimed at reducing rear glazing and ensuring tree protection and monitoring.

The public-initiated hearing drew multiple neighbors and technical experts who documented a history of slope instability on this former rock quarry site and warned of risks during excavation and shoring. "The risks during construction here are very, very large," said Alan Cropp, a long-time geotechnical reviewer, who raised concerns about weak zones, loose rock and vibration impacts during drilling.

Neighbor Bridal Perkins described proximity to existing homes and the emotional and safety concerns of families living directly below the site. "The geotechnical reports conflict and we believe lives are at risk," Perkins said.

Project architect and sponsor representatives said the design uses stepped benching into the hillside, staged shoring, and permanent debris/retaining measures; they emphasized peer review and the multiple levels of oversight that DBI and a Structural Advisory Committee (SAC) will require. Architect Earl Weiss described benching and stepped excavation as standard hillside construction techniques.

Planning staff recommended taking discretionary review and approving with modifications to reduce rear glazing and require a tree-survey and protections; commissioners approved that recommendation unanimously, 7-0, and noted that DBI review, SAC process, peer review and monitoring (survey monuments and vibration monitoring) would be applied during building-permit review.

The commission recorded conditions for clearer glazing limits at the rear, protection of significant trees, and ongoing shared monitoring with neighbors as the project advances into the technical permitting stage.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee