A new, powerful Citizen Portal experience is ready. Switch now

Lakeville Conservation Commission to review controversial parking lot project

August 18, 2024 | Town of Lakeville, Plymouth County, Massachusetts


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Lakeville Conservation Commission to review controversial parking lot project
The Lakeville Conservation Commission convened on August 13, 2024, to discuss a Notice of Intent filed by Floyd Andrews of JH Taylor Realty Corp. The proposal involves grading and drainage improvements for a parking lot located at 160 Bedford Street. The meeting, held at the Lakeville police station, highlighted concerns regarding existing environmental impacts and compliance with the Wetlands Protection Act.

Scott Reed from Firearm Engineering presented the project, which aims to replace the current crushed asphalt surface while implementing stormwater management systems, including a wet pond and a spreader trench designed to handle runoff. Reed asserted that the project would reduce runoff at all design points, addressing previous drainage issues reported by neighboring properties.

However, the commission raised significant concerns about an enforcement order related to prior damage to the site and the lack of a current Abbreviated Notice of Resource Area Delineation (ANRAD). Members expressed apprehension over potential contamination from vehicles parked on the lot, particularly regarding hydrocarbons and other pollutants. They emphasized the need for a comprehensive plan to remediate any environmental damage before proceeding with the proposed improvements.

The commission decided to continue the hearing until August 27, 2024, urging the applicant to provide a detailed response regarding the enforcement order and to consider soil testing to assess any contamination. The board expressed a desire for timely action, indicating that they would not tolerate prolonged delays in addressing the environmental concerns associated with the site.

Don't Miss a Word: See the Full Meeting!

Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.

Get instant access to full meeting videos
Search and clip any phrase from complete transcripts
Receive AI-powered summaries & custom alerts
Enjoy lifetime, unrestricted access to government data
Access Full Meeting

30-day money-back guarantee