A new, powerful Citizen Portal experience is ready. Switch now

Board directs cleaning and inspection after storm-drain backups on Sandy Court and Angler Lane

October 01, 2026 | Port Washington, Nassau County, New York


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Board directs cleaning and inspection after storm-drain backups on Sandy Court and Angler Lane
The Board accepted the Public Works report for September 2022, as prepared by Superintendent Novinski, and addressed a report of recurring storm-drain backups near the first two houses on Sandy Court and three drains near 1 and 3 Angler Lane.

The minutes state that "it was the sense of the Board that: Dejana will be engaged to clean the basins; a camera will be deployed to inspect the basins’ conditions; and West Side Engineering will be asked to strategize a solution in advance of more permanent work." The Board adopted the Public Works report by motion of Trustee Andrea Scheff, seconded by Trustee Steven Cohen.

The actions direct immediate contractor cleanup and an engineering inspection to identify short-term and longer-term fixes; the minutes do not record a timetable or cost estimate for the work.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

✓
Watch full, unedited meeting videos
✓
Search every word spoken in unlimited transcripts
✓
AI summaries & real-time alerts (all government levels)
✓
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee