The Planning Commission voted to approve the detailed site development plan for Bayside Fire (SP 20260011), a proposed 12,350‑square‑foot light‑manufacturing building in North Calvert Industrial Park. Staff presented the site layout, which includes 28 parking spaces (two ADA), one loading space, landscaping, and stormwater management; the parcel is zoned I‑1 (light industrial).
Staff noted several reductions granted administratively (side building setback reduced to 5 ft, side parking setback reduction, and a reduced rear landscape buffer to accommodate stormwater facilities) and two pending administrative variance requests that must be resolved and incorporated into the final plan. The project proposes private onsite water and sewer (well and septic), which Environmental Health must approve before building permits can be issued. DPW issued an adequate public facilities determination (project below 200 trips/day threshold). The commission approved the plan subject to the conditions and outstanding technical agency comments listed in the staff report.